Well things have been kind of crazy lately, every time I think I will have some personal time to get to finishing off the desk, something comes up. Now that my EX is moved into her new place right up the street I am there too much watching hte kids while she is at work.
School starts soon though, so should really free up some me time
Anywho, the video did not turn out of me putting it together (got a nice 3 second video of the floor though) I never claimed to be a camera man lol. But the modular nature works great


Will be cutting up a cardboard box to funnel all air from the vent into my temporary IPC (integrated PC) door. Should help get me past 3700 MHz with the freak cooler on it
Bench station is temporarily on top of the desk. This will probably go in front of the AC vent for some more benching in the near future, once I finish the IPC up.
Went to start working on the IPC tray but am having trouble locating my standoffs, so might not get it started tonight, and I am not home for long unfortunately, so probably will not get a lot done.
Tomorrow I hope to get home early though, so should get a lot of time to get it all finished up.
Once I finish with the IPC I will attach my wire management clips and get that mess cleared up as well.